TOGETHER AI DATA CENTERS

Together AI data centers.
What public records show.

Together AI is privately held and runs its GPU clusters in partner data centers. Its clearest US site is 5C's MEM01 campus in Memphis, where county permits show a phased data center build-out with backup generators. An SEC filing by partner ChronoScale shows about 6,144 H100 GPUs serving Together AI from three leased colocation sites.

SITES CHECKED OCTOBER 5, 2026

3 Together AI sites.
10 public records.

Each site sits at the highest stage a record supports. Announced megawatts are shown beside the records, never added to them. A missing record does not mean a site is behind. Many counties publish nothing online.

  1. 1Announced
  2. 0Site identified
  3. 1Permitted
  4. 0Power secured
  5. 1Operating

Not disclosed, CO, UT and MN

ChronoScale leased colocation sites

Operating

Why this stage: ChronoScale's annual report, filed with the SEC in August 2026, says it leases 1.5 MW, 5 MW and 7.5 MW at colocation sites in Minnesota, Utah and Colorado, uses them as operating space, and that Together AI uses all three. The filing does not name the cities or operators.

Owner or developer
ChronoScale Holdings (formerly Applied Digital's cloud unit), in third-party colocation centers it does not name
Together AI's role
GPU capacity supplier
Link to Together AI
“As of May 31, 2026, Cloud had one customer, Together AI, which utilizes GPU capacity across all three of our colocation centers” ChronoScale Holdings Form 10-K
Announced capacity
“dedicated NVIDIA H100 GPU infrastructure across multiple clusters totaling approximately 6,144 GPUs” ChronoScale Holdings Form 10-K
Stated timing
“We use these locations as operating space.” Source
Public records found for ChronoScale leased colocation sites, oldest first.
DateRecordWhat it showsSource
April 11, 2024SEC filingSEC EDGAR, Applied Digital Corp · Form 8-K, Q3 fiscal 2024 earnings releaseApplied Digital names Together AI as its newest Cloud Services customer.Status: FiledRecord
August 19, 2026SEC filingSEC EDGAR, ChronoScale Holdings Corp · Form 10-K for fiscal year ended May 31, 2026, Item 1Together AI is the only cloud customer, using about 6,144 dedicated H100 GPUs across three colocation centers. The agreement was renewed from March 1, 2026 for twelve months, then renews in 60-day periods unless either party gives notice.Stated capacity: “approximately 14 megawatts ( MW ) in total capacity spread across three colocations, all of which currently serve our existing customer”Status: FiledRecord
August 19, 2026SEC filingSEC EDGAR, ChronoScale Holdings Corp · Form 10-K for fiscal year ended May 31, 2026, Item 2Lists leased power and space at third-party colocation data centers in three states.Stated capacity: “We lease 1.5 MW, 5 MW, and 7.5 MW of power capacity and space from third-party-owned colocation data centers in Minnesota, Utah, and Colorado, respectively.”Status: FiledRecord
Unverified: not found in online records
  • The three colocation sites and their operators are not named in any filing found.
  • The 14 MW figure is ChronoScale's leased capacity, not a figure assigned to Together AI.
  • The agreement's current twelve-month term ends in early 2027 and then runs on 60-day renewals.

Memphis, Shelby County, TN

5C MEM01 campus, former Fred's headquarters

Permitted

Why this stage: County records show an approved site plan for the data center, completed alteration permits for Phase I and Phase III, and mechanical permits for 5 diesel and 12 natural gas emergency generators. The Phase III permit passed its building final inspection on August 14, 2026. No utility approval record was found online, so the stage stays at permitted.

Owner or developer
5C Group (formerly Hypertec Cloud), site entity 5C MEM01 Inc. Owner of record on county permits: Olymbec USA LLC
Together AI's role
Partner-built AI factory
Link to Together AI
“Together AI, in partnership with 5C, already operates an AI factory in Maryland featuring NVIDIA B200 GPUs and is bringing a new one online soon in Memphis, Tennessee, featuring NVIDIA GB200 and GB300 systems.” NVIDIA newsroom
Announced capacity
“is bringing a new one online soon in Memphis, Tennessee, featuring NVIDIA GB200 and GB300 systems” NVIDIA newsroom
Stated timing
“A new Frontier AI Factory in Memphis, jointly built with Together AI, launches in early 2026!” Source
Public records found for 5C MEM01 campus, former Fred's headquarters, oldest first.
DateRecordWhat it showsSource
August 22, 2024ZoningMemphis and Shelby County Division of Planning and Development · ASPR 2024-081Administrative site plan review for MEM01: fit out of 1 of the 3 warehouse spaces at 4300 Getwell with IT and server hosting infrastructure, with electrical rooms and a mechanical yard.Status: Closed - ApprovedRecord
March 12, 2025Building permitShelby County Code Enforcement (Develop901 portal) · COM-ALT-25-000197MEM01 commercial alteration permit for data center Phase 1, job value $25,000,000. Contacts are 5C Data Centers staff.Stated capacity: “Datacenter phase 1: Initial deployment of 2.5 MW”Status: Closed - CompleteRecord
November 19, 2025Tax abatementEconomic Development Growth Engine (EDGE) Industrial Development Board of Memphis and Shelby County · 5C MEM01 Inc. Jobs PILOT applicationLocal news reports a 15-year jobs PILOT request for a $152 million redevelopment at 4300 Getwell Road. EDGE's notice shows the meeting was canceled.Status: Not approved. The November 19, 2025 board meeting where it was scheduled was canceled. No EDGE agenda through September 2026 lists it.Record
December 31, 2025Building permitShelby County Code Enforcement (Develop901 portal) · COM-MEC-25-001921Mechanical permit titled Hypertec Generators for 5 diesel emergency generators, job value $5,000,000. These are backup units.Status: Closed - CompleteRecord
January 22, 2026Building permitShelby County Code Enforcement (Develop901 portal) · COM-ALT-26-000039Interior scope of work for Phase III of a new data center, job value $100,000,000. The permit requires a certificate of occupancy. Electrical inspection passed August 11, 2026.Status: Closed - Complete. Building final inspection passed August 14, 2026.Record
May 14, 2026Building permitShelby County Code Enforcement (Develop901 portal) · COM-MEC-26-000682Mechanical permit titled 5C Phase III - Generators for 12 natural gas emergency generators, job value $15,937,200. These are backup units.Status: IssuedRecord
September 1, 2026Grid or utilityMemphis Light, Gas and Water (MLGW), CEO remarks at Memphis City Council committee · City Council committee meeting, September 1, 2026MLGW's CEO said 5C is approved for infrastructure supporting 9 more megawatts this year and has requested a further expansion of about 50 megawatts, not expected before 2027.Stated capacity: “has been approved to build infrastructure that will support an additional 9 megawatts of compute power”Status: Reported by local news. No MLGW board or council record found.Record
Unverified: not found in online records
  • No record names Together AI at the site. The tenant link rests on NVIDIA's and 5C's public statements.
  • No record states how many megawatts or GPUs at MEM01 are Together AI's. News reports 11,000 GPUs at the site, unverified.
  • No utility approval or energization record was found online. The 9 MW approval is known only from news coverage of the MLGW CEO's remarks.
  • The certificate of occupancy for Phase III could not be opened online. 5C's homepage still says the factory launches in early 2026.

Not disclosed, MD

5C and Together AI factory, Maryland

Announced

Why this stage: Together AI and its partners describe the Maryland factory as operating, but none names the building. No government record could be tied to the site.

Owner or developer
5C Group (formerly Hypertec Cloud). Building and landlord not disclosed
Together AI's role
Partner-built AI factory
Link to Together AI
“Together AI, in partnership with 5C, already operates an AI factory in Maryland featuring NVIDIA B200 GPUs” NVIDIA newsroom
Announced capacity
“already operates an AI factory in Maryland featuring NVIDIA B200 GPUs” NVIDIA newsroom
Stated timing
“Pegatron says liquid-cooled HGX B200 racks were deployed with 5C and Together AI at a data center in Maryland.” Source

No government record found online for this site as of October 5, 2026.

Unverified: not found in online records
  • The Maryland building, county and landlord are not disclosed.
  • No megawatt, GPU count or permit record is tied to the site.
  • The Silver Spring location appears only in a third-party listing and is unconfirmed.

NOT YET CHECKED

Other Together AI sites.

These sites are named by the company or its partners. We have not yet checked their public records.

  • IREN AI cloud contractsIREN sites in British Columbia, Canada and Childress, Texas

    IREN's SEC filings list multi-year cloud contracts with Together AI in late 2025 and July 2026. No filing found names which site serves Together AI.

  • Rumble (RUM Group) B300 agreementNot disclosed

    Rumble's SEC filings describe a $270 million multi-year agreement, announced June 2026, for dedicated HGX B300 capacity for Together AI. No site named.

  • IBM Cloud B300 deploymentUnnamed US location

    Trade press reports a $240 million deal for about 2,000 B300 GPUs on IBM Cloud in the US. No site named. Not verified in a primary source.

  • Humain capacity agreementSaudi Arabia

    Reported access to 250 MW of data center power in Saudi Arabia. Outside the US.

  • 5C European capacityFrance, Netherlands, Sweden and Romania

    Together AI's site lists 150 MW+ available in Europe. Outside the US.

BEFORE YOU SIGN

Ask which site
backs your quote.

Company totals do not tell you whether your allocation is live. These questions tie a proposal to a site you can check.

  1. Which site will host my cluster: 5C's Memphis campus, the Maryland AI factory, a ChronoScale H100 site, or a partner cloud such as IREN or Rumble?
  2. If it is Memphis, is my capacity in the Phase III hall that passed final building inspection in August 2026, or in a later phase that still needs utility capacity?
  3. If it is H100 capacity through ChronoScale, what happens after that agreement's current term ends in February 2027 and moves to 60-day renewals?
  4. Who holds the power and space contract for my cluster, Together AI or its partner, and what is my recourse if the partner does not deliver?

WORK THROUGH IT WITH AN ADVISOR

Check a Together AI proposal against the record.

Bring your workload, launch date and what could change. We can help you evaluate capacity, compare proposals and identify the deployment support you need.

Discuss my project ↗

Notes on these records

  • Together AI is private and files no SEC reports. Partners that name it in SEC filings are ChronoScale, IREN, Rumble and Applied Digital.
  • The 200 MW headline is Together AI's own February 2025 statement. Its current site says "2GW+ in the portfolio with 600MW of near-term capacity in US", which describes partner portfolio capacity. Neither figure is added to recorded megawatts.
  • Memphis permits name 5C and Hypertec, Together AI's build partner, but not Together AI itself.
  • A third-party listing shows Together AI regions in 14 US cities, including Memphis and Silver Spring, Maryland. Together AI's own pages did not name cities on October 4, 2026, so the listing is not used as a tenant link.

Records were read online on October 5, 2026. Corrections are welcome through the form below. All providers ↗

WHY WORK WITH US

Powered by
Bridgepointe Technologies.

GPU Cloud Advisors is powered by Bridgepointe Technologies, a technology advisory firm since 2002. You get one advisor, the research on this site, and the provider relationships behind it.

Bridgepointe clients include

  • NVIDIA
  • Salesforce
  • Adobe
  • Uber
  • Netflix
  • Airbnb
  • Roblox
  • LinkedIn
  • CrowdStrike
  • Sony
  • PayPal
  • Mastercard

75+ Fortune 500 clients

Including more than 20 of the Fortune 100, with 97% client satisfaction.

1,200+ data center and cloud projects

Requirements assessed, capacity sourced and providers selected.

Terms, not just the rate

We negotiate ramp schedules, early billing and expansion terms, so you aren’t paying for capacity before your workload can use it.

One requirement, every fit

Bridgepointe partners with 380+ technology providers. We take one requirement to the providers that fit it and bring back a side-by-side comparison you can actually decide from.

Case study: Bridgepointe helped Hive, an AI company, choose data center and connectivity providers across 15 projects, saving its team at least 180 hours. Ask us for the case study

LET’S PLAN YOUR GPU PROJECT

Tell us what
you need.

Two short steps. Tell us what you’re building and an advisor will help you evaluate providers, confirm capacity requirements, and plan the support you need to get into production.

Not sure which GPU or how many you need? Start with your workload and what could change.

Our advisory services are free to you. We’re compensated by whichever provider you choose through us.

No obligationSizing help welcome
What we’ll work through with you
  • A provider shortlist suited to your workload and location.
  • Initial capacity, expansion needs and delivery timing to confirm.
  • Total cost, commitment terms and deployment support to compare.
Step 1 of 2What you need

Include GPU type, quantity and likely growth if known. A rough outline is enough.

Step 2 of 2Who you are

We’ll use these details to respond to your project request. Please leave out sensitive data and credentials. Privacy notice.

Prefer to talk it through? Book a free 30-minute consultation or call 844-506-2299.